Hauling and Launching Instructions for Willow
Hauling Out
- Mizzen mast stays up
- Loosen the mizzen topping lift while carefully laying the mizzen
boom on the top of the Hydrovane.
- Insert the centerboard handle in the centerboard winch
- The sling locations are on the port side topside above the rubrail.
- The aft sling is near the gate.
- Make sure that the sling is not on the rudder and not on
the centerboard.
- The forward sling is near the aft lower shroud
- Once out of the water and backed away from the pit:
- Lower the centerboard to check the pennant condition and to
powerwash it.
- It takes 70 turns of the winch handle to completely lower the
centerboard.
- After powerwashing and inspection, raise the centerboard with
the winch handle.
Launching
- The centerboard needs painting before launching
- The best way is to lift Willow before lunch, paint the
centerboard, and then launch after lunch
